The former tin mining communities of Redruth, Camborne and Poole were in great need of regeneration. Llewelyn Davies were appointed to draw up a regeneration framework.
The transport elements of that framework were based on the principle of decoupling economic growth from traffic growth in order to move away from dependency on the car. New development was to take place where it could be served by an improved public transport system and walking and cycling access to employment and facilities. The intention was thus to hold levels of car use roughly constant, with increased movements taken up by bus, rail, cycling and walking.
A draft version of the final report can be found in the right sidebar, along with a brief review of the plan that was published in Regeneration magazine.
Location | Redruth, Camborne, Pool England |
---|---|
Date(s) | 2000 |
Client(s) | Princes Trust and local authorities |
Team(s) | Tim Pharoah with Llewelyn Davies |
keywords
Urban regeneration, transport planning, land use and transport planning, integrated transport, sustainable transport, Camborne, Pool, Redruth, Cornwall
images (2)
attached documents (2)
- Review of the Redruth Camborne Pool regeneration study August 2002
- Draft report (full final report not available) June 2001